Service Capabilities & Technical Scope
Senior composite engineer site audits, chemical compatibility evaluations, DVS 2205 calculations, and plant inspection services.
Deployment
Pan-India Coverage
Mobilization
Senior Chartered Engineers
Design Standard
DVS / ASME / BS / ASTM
Quality Protocol
Comprehensive Report
Expert On-Site Chemical Compatibility Surveys, Plant Layout Audits & Design Sizing
Execution Methodology & Engineering Standards
1. Expert Chemical Compatibility Audits
We evaluate exact fluid compositions, trace contaminants, thermal peaks, and specific gravities to prevent premature equipment failure.
2. Optimized Plant Footprint & Sizing
Our 3D CAD specialists conduct on-site laser measurements to optimize nozzle clearances, piping runs, and containment dyke layouts.
Service Specifications & Quality Parameters
| Service Parameter | Standard Specification |
|---|---|
| Consultation Scope | MOC Material Selection, DVS 2205 Wall Thickness Calculation, Failure Root Cause Analysis (RCA) |
| On-Site Tools | Laser Distance Meters, Ultrasonic Wall Gauges, Barcol Hardness Testers, Thermal Imagers |
| Engineering Deliverables | 3D SolidWorks General Arrangement (GA) Drawings, Detailed P&ID, Structural FEA Reports |
| Standards Covered | German DVS 2205, ASME RTP-1, BS 4994, EN 13121, ASTM D3299, IS 6746 |
| Industries Audited | Chemical, Pharma, Galvanizing, Electroplating, Chlor-Alkali, ETP/STP Plants |
| Turnaround Time | Initial engineering report delivered within 3-5 business days |
Industries Served
Greenfield Projects
Complete Plant Chemical Storage Layouts
Plant Expansions
Capacity Upgrade & Nozzle Sizing
Process Optimization
Fume Extraction CFM Balancing
Failure Analysis
Corrosion Root Cause Investigation
Regulatory Audits
CPCB / SPCB Containment Compliance
Tender Specification
Technical RFP & Bid Document Preparation